Toggle ScrolliPage Nav
The following projects went thru the Schematic Design Phase and did not get completed
|
Harley DavidsonProject consisted of an existing site with two existing metal buildings (16,370 sf & 12,330 sf) and will include a new building addition (+/- 10,000 sf) to combine the existing buildings together for a motorcycle dealership showroom complete with offices, show floor and repair shop. An adjacent 8,000 sf existing building will serve as a full-service restaurant with interior dining. In addition, a large outdoor covered structure (55,000 sf) for outside dining and events is to be included. (Optional). An existing 5,000 sf rectangular building will be utilized as storage for motorcycles.
|
|
Plant City Community Center-RFPProvide design services for the construction of an approximate 29,000 square foot building to be
utilized as a multi-purpose community center for the City of Plant City. The Proposer will be required to incorporate multi-use features into the design of the center to include: two full size indoor basketball courts (that can also be converted for other uses); meeting room(s); craft room(s); computer lab room; storage rooms; restrooms; office(s); and sufficient parking. Corporate Headquarters - Office and Warehouse
|
|
Condominium Project
South Tampa |