Toggle ScrolliPage Nav
|
Arbor Greene - Club House Renovation
Size: 7,865 SF
Four phase renovation included multipurpose room, interior partition removal, structural strengthening of roof framing, opening up the interior space to accommodate new office and yoga room, ADA bathroom updates, women's and men's locker rooms.
|
|
Ridgeview Apartments
Scope: The project scope consists of the design of a new Apartment Complex in Seminole, FL. We aided our client in the renovation of 136 apartment units spread over 14 buildings. In addition, a Club House was included in the scope of the renovation. Scope included new HVAC systems, electrical updates, the addition of a washer/dryer for each unit and other minor electrical & plumbing modifications. We included design for each unique unit type (5 total units) and provided overall plans where required.
|
|
Manatee Condominium
Naples, FL Irma Hurricane Roof Repairs Size:11,000 SF-14,000 SF Developed architectural specifications to remove and replace the roof at Manatee Condominiums.
Prepared Document submittal to warranty a permit at Collier Building Department. Assisted with the review of competitive bids. Reviewed Contractor product submittals for compliance to specifications. Provided selective as-needed construction observation on an hourly basis fee.
|
|
Florida Seating
Project is an interior renovation of approximately 7,920 square feet to demolish existing offices, remove A/C, demolition of existing restrooms, provide new lighting (LED ballasts retrofits where needed), and rework the fire sprinkler system (performance base).
|
|
Lake Bernadette ClubhouseSize: 6,030 SF
Four phased club house renovation at community center. Work consisted on providing a renewed gym space with new finishes, lighting and layout. New bathroom/lockers and overall interior new finishes.
Client requested bidding and negotiation services as well as project oversight throughout construction.
|
|
St. Andrews ApartmentsHurricane Michael Repairs
Size: 154,653 SF
Work consisted on reconstruction of exterior walls, flashing details and specifications, reconstruction of interior units damaged by Hurricane Michael.
|
|
Ion Labs
Size: 90,000 SF
Project consisted of the conversion of an existing space into a new manufacturing and processing facility for Ion Labs. The new facility included areas for storage, compression, coating, blending, packaging and shipping.
|
|
Severn Trent
Architectural services for the replacement of 510 linear feet of retaining walls at the back property lines of residences lots. The existing walls retain approximately three to four feet of soil, where the lots transition to lower elevated land.
|