Brewster TC - Cosmetology Lab
Erwin TC - Surgery Program
Erwin TC - Dental Program
Erwin TC - Welding Program
Robinson HS - Renovation and Mechanical Upgrades
- DC Studio is working on the renovation, HVAC updates and new construction of Robinson HS project for HCPS in collaboration with Wilder Architects and under Carastro Engineers and Associates (now BSA Life Structures)
- Campus wide HVAC Renovation
- Campus wide misc. renovations
- New Construction and Interior lab renovations
- Full renovation of entire locker room building
Robinson High School Classroom Addition
|
Size: 12,000 SF
|
We designed a 12-classroom addition to Robinson High School, Driver Education with exterior covered classroom, parking re-layout and new entry to High School.
|
|
Robotics Lab
|
The scope consisted of converting an existing non-conditioned wood work shop into an advanced robotics lab. Epoxy floor finishes, Mechanical coordination for exhaust fans with complex equipment requirement and ventilation. Coordination of robotics equipment requirements with Electrical, Mechanical and Fire consultants.
|
|
Marshall Middle School – 2008 (HCPS)
|
Area: 12,500 s.f.
Budget: $1,848,000 Scope: 12 Classroom Addition Role: Architectural Intern/Project Manager |
|
Northwest Elementary School – 2008 (HCPS)
|
Area: 11,901 s.f.
Budget: $1,848,000 Scope: 12 Classroom Addition Role: Architectural Intern/Project Manager |
|
Maniscalco Elementary School – 2008 (HCPS)
|
Area: 14,385 s.f.
Budget: $2,156,000 Scope: 14 Classroom Addition Role: Architectural Intern/Project Manager |
|
Springhead Elementary School – 2006 (HCPS)
|
Area: 16,639 s.f.
Budget: $2,085,000 Scope: 16 Classroom Addition Role: Architectural Intern/Project Manager during construction |
|
Apollo Beach Elementary School – 2008 (HCPS)
|
Area: 98,400 s.f.
Budget: $4,380,000 Scope: HVAC and Interior Renovations Role: Architectural Intern/Project Manager |
|
Franklin Middle School, (HCPS)
|
Franklin Middle School, (HCPS)
Scope: Extensive detailing for water proofing historic building’s parapet, overflow details, and on-site supervision. Window Repair-Water intrusion Role: Architectural Intern/Project Manager |
|
West Tampa Re-roofing, 2009 (HCPS)
|
Area: 59,000 s.f.
Scope: New aluminum cap seals at entry, coping stones, pediments, etc. Budget: $542,999 Role: Architectural Intern/Project Manager |
|
Cork Elementary, 2007 (HCPS)
|
Area: 16,639 s.f.
Scope: 16 Classroom Addition (2006) Budget: $2,085,000 Interior Renovations (2007) Budget: $4,350,498 Role: Architectural Intern/Project Manager |
|
Marshall Middle School, 2009 (HCPS)
|
Scope: Minor Architectural Services, Canopy Re-painting throughout the school
Role: Architectural Intern/Project Manager |
|
Rossac, 2004-2006 (HCPS)
|
Scope: HVAC and Finishes
Budget: $2,833,623 Role: Architectural Intern/Project Manager |
|
Brewster Technical School, 2008 (HCPS)
|
Scope: Roof Repairs, Flashing Revisions, Water Intrusion, Re-roofing of Portables
Cost: $1,070,000 Role: Architectural Intern/Project Manager |
|
Bing Elementary School, 2004 (HCPS)
|
Area: 50,000 s.f.
Scope: Mechanical Renovation, reroof and Misc. aesthetic upgrades Budget: $4,200.000 Role: Architectural Intern/Project Manager |
|
Prototype Roof Standards– 2014 (HCPS)
|
Scope: Prototype standard for “Five Crimp Metal Roof systems” and “PVC Re-roof Systems”
Role: Architectural Intern/Project Manager |
|
E. Lois Center Re-roofing 2013 (HCPS)
|
Scope: Re-roofing maintenance buildings – minor structural repairs
Role: Architectural Intern/Project Manager |
|
Sulphur Springs E.S. Canopy Re-roof– 2014 (HCPS)
|
Scope: Walkway canopy re-roof, ceiling repairs, flashing, roof edge details
Budget: $140,000 Role: Architectural Intern/Project Manager |
|
Maintenance West Re-roof, 2013 (HCPS)
|
Scope: Re-roof maintenance buildings, minor structural repairs as needed
Budget: $280,000 Role: Architectural Intern/Project Manager |
|