Robotics Lab
The scope consisted of converting an existing non-conditioned wood work shop into an advanced robotics lab. Epoxy floor finishes, Mechanical coordination for exhaust fans with complex equipment requirement and ventilation. Coordination of robotics equipment requirements with Electrical, Mechanical and Fire consultants.
|
|
Robinson High School Classroom Addition
Size: 12,000 SF
We designed a 12-classroom addition to Robinson High School, Driver Education with exterior covered classroom, parking re-layout and new entry to High School.
|
|
Franklin Middle School, (HCPS)
Scope: Extensive detailing for water proofing historic building’s parapet, overflow details, and on-site supervision. Window Repair-Water intrusion Role: Architectural Intern/Project Manager
|